← Bilder LabsDesign exploration · Atap is a fictional architecture studioAdapt this design

Design, permits
and construction.

Architecture studio
in Malang, East Java

Houses built for
the tropics.

Ijen Pool Villa, a two-storey white and timber house under a clear sky
Banyuwangi, East Java

Architecture studio in Malang for tropical modern houses and villas. Designed for the heat, the rain and the way you live.

About us

ATAP MEANS “ROOF”

Every house we design starts with the roof: deep overhangs for shade, a pitch that clears tropical rain and openings that let air move through. Then we take it through the PBG permit and build it.

Tumpang House at dusk, dark timber facade under a large tree
48homesHouses completed
10yrsPractising in Malang
12,400m²Built floor area
100%PBG permits approved

Selected projects

From compact city houses to rental villas, each one designed for its site, budget and weather.

1.

A family home on a sloping plot facing Mount Semeru. The roof extends 2.4 m to shade the glass from the afternoon sun.

Location
Tumpang, Malang
Year
2025
Area
320 m²
Scope
Design & build

Tumpang House

Tumpang House with timber cladding and full-height glass
2.

A three-bedroom rental villa where every room opens onto a 14 m lap pool.

Location
Banyuwangi
Year
2024
Area
280 m²
Scope
Design & build

Ijen Pool Villa

Ijen Pool Villa, white house with a long pool
3.

Recycled ironwood over a concrete frame, built for cool highland nights.

Location
Batu
Year
2024
Area
240 m²
Scope
Design, PBG

Batu Timber House

Batu Timber House with a timber-clad upper floor
White modern house with deep roof overhangs and a pool

A house that works with the weather

How we design
Roof overhang

At least 1.2 m on the west side, so walls and glass stay shaded after 2 pm.

Cross ventilation

Openings on opposite walls of every room, so air moves without air conditioning.

Rainwater

Roof water is collected in an underground tank and reused for the garden.

Local materials

Andesite stone from Malang and plantation teak to keep transport and cost down.

  • Roof overhangAt least 1.2 m on the west side, so walls and glass stay shaded after 2 pm.
  • Cross ventilationOpenings on opposite walls of every room, so air moves without air conditioning.
  • RainwaterRoof water is collected and reused for the garden.
  • Local materialsAndesite stone from Malang and plantation teak.

Services

Design only, or design and build. One team from the first sketch to handover.

Architecture design

Concept, design development and full construction drawings.

  • Site and climate study
  • 3D model and renders
  • Construction drawings

Interior design

Built-in joinery, lighting and materials that match the architecture.

  • Joinery drawings
  • Lighting plan
  • Material board

PBG permit

Everything the SIMBG system needs for your Persetujuan Bangunan Gedung.

  • Architectural drawings
  • Structural calculation
  • SIMBG submission

Construction

We manage the contractor, budget and schedule with weekly site reports.

  • Bill of quantities
  • Weekly site report
  • 12-month warranty

From land to keys

Typical timeline for a 200–300 m² house. You approve each phase before the next starts.

  1. 01

    Brief & site visit

    We measure the land, study sun and wind, and agree the brief and budget.

    2 weeks
  2. 02

    Concept design

    Plans, sections and a 3D model, with two rounds of changes.

    4–6 weeks
  3. 03

    Drawings & PBG permit

    Construction drawings, structure, MEP and the SIMBG submission.

    6–8 weeks
  4. 04

    Construction

    Tender, build and handover with a 12-month defect warranty.

    8–12 months

Journal

Practical guides for building a house in East Java.

FAQ

Questions we hear at almost every first meeting.

How much does it cost to build a house in Malang?

For our projects in 2026, construction typically costs IDR 6–9 million per m² for a two-storey tropical modern house, depending on structure, finishes and site. Our design fee is 6–8% of the construction cost.

How long does a house project take?

Around 3–4 months for design and the PBG permit, then 8–12 months of construction for a 200–300 m² house.

Do you handle the PBG building permit?

Yes. We prepare the drawings, structural calculations and SIMBG submission for the PBG (Persetujuan Bangunan Gedung) and follow it through to approval.

Do you work outside Malang?

Yes. We work across East Java and Bali, and take design-only commissions anywhere in Indonesia.

Can you design a house without building it?

Yes. Design-only projects include full construction drawings, a bill of quantities and site visits during construction.

Tell us about your land. We’ll visit it.

We reply within two working days.

Want this for your studio? Adapt it →